Industrial Plant of Johnson Matthey

where AECOM did the Design and Project Management
Scope: Perform engineering coordination using 3D BIM model for Structural, Architectural and MEPF services including modelling of plant’s process utilities at GFC stage. Updating the 3D BIM model with MEPF ‘shop’ drawings during the construction stage and help contractor in reaching the clash-free 3D BIM model/ engineering stage.
BU A:15,500.000 sq.M
Project Cost: INR 8.000 Billion (Pound£ 83.430 million) approx.
Duration: From March 2019 till July 2021